CLIENT AND PROJECT:
Ameren Substation Oil Containment,
St. Louis, MO
PROJECT TYPE: CURRENT SITE IMPROVEMENTS
Ameren depended on the Interface’s quality and safety control measures to successfully install a new oil containment system in an active, energized substation.
![Ameren logo Ameren logo](https://www.interfaceconstruction.com/wp-content/uploads/2018/10/Ameren-logo.png)
Safety Management
The oil containment system was installed without any safety incidents or unscheduled electric outages.
![Ameren Page (1) Ameren Page (1)](https://www.interfaceconstruction.com/wp-content/uploads/2018/10/Ameren-Page-1.jpg)
Notable Installations by the Interface Construction Corporation Team
- Shoring for the containment system holding a 20,000-gallon oil tank within an energized Ameren substation
Interface self-performed the cast-in-place concrete and oil containment system while working outside the minimum approach distances from active, high-voltage electric lines, requiring an in-depth safety plan consisting of a full-time monitoring system.
Key Project Personnel
Mark Boehms-Interface Vice President and Project ManagerBob Lynch-Interface Superintendent
Ameren Design Team