![USDA RDCOE_2 USDA RDCOE_2](https://www.interfaceconstruction.com/wp-content/uploads/2018/10/USDA-RDCOE_2-1.jpg)
CLIENT AND PROJECT:
USDA Rural Development Center of Excellence,
St. Louis, MO
PROJECT TYPE: RENOVATION
Interface’s successful history in design-build renovations ranked them as a superior candidate for the numerous updates to the administrative area of the Center.
OLD BUILDING RESTORATION AND RENOVATION
![USDA RDCOE_1 (1) USDA RDCOE_1 (1)](https://www.interfaceconstruction.com/wp-content/uploads/2018/10/USDA-RDCOE_1-1.jpg)
Notable Installations by the Interface Construction Corporation Team
- Over 80,000 square feet of office space transformed into modern, open space environment incorporating the latest technology
- New high efficiency HVAC control system, becoming the new standard of the USDA’s Goodfellow campus
- New energy efficient lighting and thermally-efficient windows
The new building was constructed on-time, even after enduring many delays related to incomplete drawings, inclement weather, and soil treatment.