Total Access Urgent Care relied on Interface’s expertise in healthcare construction to control quality, safety and cost for all of their new-build urgent care facilities.
![totalAccess totalAccess](https://www.interfaceconstruction.com/wp-content/uploads/2018/10/totalAccess.png)
SCHEDULE MANAGEMENT
Interface was able to reduce the construction schedule of each Total Access Urgent Care building structures by one-third of the expected time.
![IMG_3438 (1) IMG_3438 (1)](https://www.interfaceconstruction.com/wp-content/uploads/2018/10/IMG_3438-1.jpg)
Notable Installations by the Interface Construction Corporation Team
- Pre-fabricated wall panels that saved on construction cost and schedule, over 20 panels per facility
Interface self-performed the construction management, general conditions, supervision, demolition, carpentry, drywall, millwork, acoustical ceilings, doors frames and hardware, and specialties.